Athesi EVM10A Android 12 4Gb RAM, 64Gb Flash, WiFi, Bluetooth, 4GLTE, RS232, USB
4GbRAM/64Gb Flash, GPS, 10" display HD 800 x 1280 tactile capacitive, 700 nits ,Wifi 802.11 a/b/g/n/ac, Bluetooth Rev
5.2, USB 2.0 Type A, 4GLTE, 1000M Ethernet (12 pin connector), 1 RS232 + 1 RS232/RS485 (12 pin connector), 1 USB 2,0 + 1 CAN/CVBS (12 pin connector), 1GPIO, input voltage 12V, IP65, operate temp -20°C to 60°C, 2000mA 7,4V internal battery
The Athesi EVM10 Android brings mobile-optimized logistics coordination directly into vehicle cabins, eliminating dispatch fragmentation without dedicated infrastructure. Wide 9–36V voltage tolerance integrates seamlessly into commercial vehicles, forklifts, and agricultural equipment without power converters. IP65 protection withstands dust, vibration, and washdown exposure during heavy-use operations. Built-in GPS/GLONASS enables real-time fleet tracking and geofencing. Dual-band WiFi and optional 4G LTE connect to backend dispatch platforms over multiple routes. Flexible aviation plug expansion supports custom Android integrations for loader, truck, or tractor workflows. Native app ecosystem accelerates field team adoption versus Linux training overhead.
Specifications
| Connectivity / Interface | 4G or Bluetooth or RS232 or USB or WiFi |
| Brand | Athesi |
| Processor | Celeron |
| Operating System | Android |
| RAM | 4Gb |
| Hard Drive Type | Flash |
